Difference between revisions of "Minutes-4-22-2010"
From GlueXWiki
Line 6: | Line 6: | ||
# Production | # Production | ||
#* Update on the off-site production space [http://www.jlab.org/Hall-D/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan] | #* Update on the off-site production space [http://www.jlab.org/Hall-D/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan] | ||
− | #* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2] | + | #* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table] |
# Updates on: | # Updates on: | ||
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim) | #* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim) |
Revision as of 19:29, 21 April 2010
April 15, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- UVA wire stringing equipment (Brian) pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- Updates on:
- Electronics: finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right (Fernando, Kim)
- Cathode redesign (Bill, Roger)
- Tests of the new frame prototype (Lubomir)
- Full scale prototype
- Three-layer HV tests (Beni)
- Preparations for cosmics tests
- Other