Difference between revisions of "Minutes-4-22-2010"
From GlueXWiki
Line 1: | Line 1: | ||
− | April | + | April 22, 2010 FDC meeting |
Revision as of 20:22, 21 April 2010
April 22, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian): pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Bill, Roger)
- FDC cabling(Bill)
- Full-scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other