Difference between revisions of "Minutes-5-6-2010"
From GlueXWiki
Line 11: | Line 11: | ||
#* PCB (Kim, Fernando) | #* PCB (Kim, Fernando) | ||
#* fADC125 test plans (Fernando) | #* fADC125 test plans (Fernando) | ||
− | # Cathode redesign | + | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes] (Bill, Roger) |
# Cosmic tests (Beni) | # Cosmic tests (Beni) | ||
# Other | # Other | ||
+ | #* summer students, techs from FEL for FDC work | ||
#* talks at the Collaboration meeting | #* talks at the Collaboration meeting | ||
#* no meeting next week | #* no meeting next week |
Revision as of 11:39, 6 May 2010
May 6, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- Electronics
- update on oscillation problem (Fernando)
- possible grounding improvement
- PCB (Kim, Fernando)
- fADC125 test plans (Fernando)
- Cathode redesign Bill's changes (Bill, Roger)
- Cosmic tests (Beni)
- Other
- summer students, techs from FEL for FDC work
- talks at the Collaboration meeting
- no meeting next week