Difference between revisions of "Sep 16, 2010 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
(→Items for followup from previous meeting(s)) |
||
Line 15: | Line 15: | ||
#* <strike> Elton and Ashot to meet and resolve any discrepancies between the simulations. </strike> | #* <strike> Elton and Ashot to meet and resolve any discrepancies between the simulations. </strike> | ||
#* Tim to check on magnetic checks of non-corrosion coated shield. | #* Tim to check on magnetic checks of non-corrosion coated shield. | ||
+ | #* Elton to check what to do with cables that do not meet CL2 specification. Excess? Distribute to collaborating universities? | ||
# SiPM decision | # SiPM decision | ||
#* IU: geometry for summed units | #* IU: geometry for summed units |
Revision as of 14:19, 2 September 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
- Fcal
-
Elton and Ashot to meet and resolve any discrepancies between the simulations. - Tim to check on magnetic checks of non-corrosion coated shield.
- Elton to check what to do with cables that do not meet CL2 specification. Excess? Distribute to collaborating universities?
-
- SiPM decision
- IU: geometry for summed units
- JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- BCAL
- Construction Status
- SiPM update
- FCAL
- Construction status
- To shashlyk or not to shashlyk.
- Simulations
- Other Updates
Minutes
Attendees: