** [[Private:Construction |All pending contracts are signed.]] | ** [[Private:Construction |All pending contracts are signed.]] | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
− | ** Trigger/DAQ/Monitoring/Controls ([[OWG Meeting | + | ** Trigger/DAQ/Monitoring/Controls ([[OWG Meeting 01-Sep-2010 |Minutes from September 01]]) |
− | ** Tracking ([[ | + | ** Tracking ([[September 1, 2010 Tracking CDC/FDC|Minutes from September 1 ]]) |
** Calorimetry ([[Sep 16, 2010 Calorimetry|Minutes from Sep 16]]); Readout ([[Aug 26, 2010 Readout|Minutes from August 26]]) | ** Calorimetry ([[Sep 16, 2010 Calorimetry|Minutes from Sep 16]]); Readout ([[Aug 26, 2010 Readout|Minutes from August 26]]) | ||
** Start Counter | ** Start Counter | ||
Line 41: | Line 41: | ||
** Offline Software ([[GlueX Offline Meeting, September 21, 2010#Minutes|Minutes from September 21]]) | ** Offline Software ([[GlueX Offline Meeting, September 21, 2010#Minutes|Minutes from September 21]]) | ||
** Photon Beam and Tagger ([[BLTWG Meeting 09/20/2010|Minutes from September 20]], [[BLTWG Meeting 08/25/2010|August 25th]]) | ** Photon Beam and Tagger ([[BLTWG Meeting 09/20/2010|Minutes from September 20]], [[BLTWG Meeting 08/25/2010|August 25th]]) | ||
− | ** Physics ([[August | + | ** Physics ([[August 30, 2010 (11AM), Physics Working Group|Minutes from August 30]]) |
* AOT | * AOT |
Revision as of 14:38, 21 September 2010
Meeting Time and Place
The meeting will be on Wednesday September 22, 2010 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-800-377-8846 : US +1-888-276-7715 : Canada +1-302-709-8424 : International then enter participant code: 77438230# (remember the "#")
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Agenda
- Announcements
- Upcoming Reviews
- Lehman Review
- Magnet Review (September 2010)
- MOU and Contract Status
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls (Minutes from September 01)
- Tracking (Minutes from September 1 )
- Calorimetry (Minutes from Sep 16); Readout (Minutes from August 26)
- Start Counter
- PID/TOF (Minutes from September 17)
- Magnet
- Engineering
- Electronics
- Offline Software (Minutes from September 21)
- Photon Beam and Tagger (Minutes from September 20, August 25th)
- Physics (Minutes from August 30)
- AOT