Difference between revisions of "Minutes-10-7-2010"
From GlueXWiki
Line 3: | Line 3: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
− | # | + | # Production |
#* Blue Crab status | #* Blue Crab status | ||
#* Frame production | #* Frame production |
Revision as of 16:04, 6 October 2010
October 7, 2010 FDC meeting
Tentative Agenda
- Production
- Blue Crab status
- Frame production
- Electronics
- Update on PCBs, fADC125 and other (Fernando, Chris, Gerard)
- Engineering (Bill and David)
- Wire stringing: fixtures, movement system
- Other: gas system using methane
- Full-scale prototype
- testing fADC125 (Beni)
- plateau studies with 80/20 (Beni)
- resolutions with different gas mixtures and HV (Lubomir)
- argon/CO2/methane gas mixture properties (Lubomir)
- Other