Difference between revisions of "Minutes-10-7-2010"
From GlueXWiki
Line 8: | Line 8: | ||
# Electronics | # Electronics | ||
#* Update on PCBs, fADC125 and other (Fernando, Chris, Gerard) | #* Update on PCBs, fADC125 and other (Fernando, Chris, Gerard) | ||
− | # Engineering | + | # Engineering |
− | #* Wire stringing: fixtures, movement system | + | #* Wire stringing: fixtures, movement system (Bill, David) |
+ | #* Update on tension measurements (Lubomir) | ||
+ | #* Wire tension requirements (Lubomir) | ||
#* Other: gas system using methane | #* Other: gas system using methane | ||
# Full-scale prototype | # Full-scale prototype |
Revision as of 17:01, 6 October 2010
October 7, 2010 FDC meeting
Tentative Agenda
- Production
- Blue Crab status
- Frame production
- Electronics
- Update on PCBs, fADC125 and other (Fernando, Chris, Gerard)
- Engineering
- Wire stringing: fixtures, movement system (Bill, David)
- Update on tension measurements (Lubomir)
- Wire tension requirements (Lubomir)
- Other: gas system using methane
- Full-scale prototype
- testing fADC125 (Beni)
- plateau studies with 80/20 (Beni)
- resolutions with different gas mixtures and HV (Lubomir)
- argon/CO2/methane gas mixture properties (Lubomir)
- Other