Difference between revisions of "Minutes-5-5-2011"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
# Engineering status (Bill)
 
# Engineering status (Bill)
 
# Chamber testing (Beni)
 
# Chamber testing (Beni)
#* Equipment needed for Blue Crab
+
#* [http://www.jlab.org/Hall-D/detector/fdc/production/equipment_bluecrab.txt Equipment needed for Blue Crab]
 
#* Pressure measurements
 
#* Pressure measurements
 
# Other
 
# Other

Revision as of 11:07, 5 May 2011

May 5, 2011 FDC meeting

Agenda

  1. Production
    • Status (Dave)
    • Wire position scanning (Lubomir)
    • End window material (Bill)
  2. Electronics (Fernando, Chris)
    • Status
    • Rigid-flex stuffing
  3. Engineering status (Bill)
  4. Chamber testing (Beni)
  5. Other