Difference between revisions of "Minutes-5-5-2011"
From GlueXWiki
Line 12: | Line 12: | ||
# Engineering status (Bill) | # Engineering status (Bill) | ||
# Chamber testing (Beni) | # Chamber testing (Beni) | ||
− | #* Equipment needed for Blue Crab | + | #* [http://www.jlab.org/Hall-D/detector/fdc/production/equipment_bluecrab.txt Equipment needed for Blue Crab] |
#* Pressure measurements | #* Pressure measurements | ||
# Other | # Other |
Revision as of 11:07, 5 May 2011
May 5, 2011 FDC meeting
Agenda
- Production
- Status (Dave)
- Wire position scanning (Lubomir)
- End window material (Bill)
- Electronics (Fernando, Chris)
- Status
- Rigid-flex stuffing
- Engineering status (Bill)
- Chamber testing (Beni)
- Equipment needed for Blue Crab
- Pressure measurements
- Other