** Should we locate the main PLC in the hall? | ** Should we locate the main PLC in the hall? | ||
− | + | * When should we use a PC104 vs an IOC on a PC vs direct PLC control? | |
− | * | + | ** Should the FDC gas system use just PLC control and not use a PC104? |
Revision as of 09:04, 3 June 2011
- Should we use ControlNet as well as Ethernet/IP?
- Would we have to run a copper line to the counting house?
- Should we use an additional PLC in the hall?
- Should we locate the main PLC in the hall?
- When should we use a PC104 vs an IOC on a PC vs direct PLC control?
- Should the FDC gas system use just PLC control and not use a PC104?