Difference between revisions of "Controls To Do List"
From GlueXWiki
m |
m |
||
Line 3: | Line 3: | ||
** Should we use an additional PLC in the hall? | ** Should we use an additional PLC in the hall? | ||
** Should we locate the main PLC in the hall? | ** Should we locate the main PLC in the hall? | ||
+ | |||
* When should we use a PC104 vs an IOC on a PC vs direct PLC control? | * When should we use a PC104 vs an IOC on a PC vs direct PLC control? | ||
** Should the FDC gas system use just PLC control and not use a PC104? | ** Should the FDC gas system use just PLC control and not use a PC104? |
Revision as of 09:04, 3 June 2011
- Should we use ControlNet as well as Ethernet/IP?
- Would we have to run a copper line to the counting house?
- Should we use an additional PLC in the hall?
- Should we locate the main PLC in the hall?
- When should we use a PC104 vs an IOC on a PC vs direct PLC control?
- Should the FDC gas system use just PLC control and not use a PC104?