== Production == | == Production == | ||
− | - Dave (see the construction tracking): | + | - Dave (see the construction tracking): Techs are finishing the cathodes for cell#5 |
- Waiting for the chemicals for the wire deadening; probably will start testing the procedure beginning of next week. Bill: what is the wire diameter needed to deaden the wire? Lubomir: according to Garfield if we make sense wires 40um signal drops by factor of 40, for 60um - factor of 400, and for 80um -factor of 2,700. After some discussions, Bill will look what is the sagging effect of thickening the wires and Lubomir will estimate the suppression factor that we need. | - Waiting for the chemicals for the wire deadening; probably will start testing the procedure beginning of next week. Bill: what is the wire diameter needed to deaden the wire? Lubomir: according to Garfield if we make sense wires 40um signal drops by factor of 40, for 60um - factor of 400, and for 80um -factor of 2,700. After some discussions, Bill will look what is the sagging effect of thickening the wires and Lubomir will estimate the suppression factor that we need. |
Revision as of 15:24, 28 July 2011
July 28, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Status
- Wire deadening
- Leakage current tests (Lubomir)
- Revised short term production schedule (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- Chamber testing at EEL126 (Beni)
- Status and plans efficiency plot
- Other