Difference between revisions of "Sep 29, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
 
(Action Items from previous meetings)
Line 2: Line 2:
  
 
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
 
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
 +
# Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:17, 22 September 2011

Action Items from previous meetings

  1. Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
  2. Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: