Difference between revisions of "Sep 29, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 3: | Line 3: | ||
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl) | # Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl) | ||
# Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs. | # Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs. | ||
+ | # Chris to check HV specs on coax cable. (Needs to hold at least 80 V). | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:27, 22 September 2011
Action Items from previous meetings
- Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
- Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs.
- Chris to check HV specs on coax cable. (Needs to hold at least 80 V).
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (everyone)
- Light source / optics
- Electronic boards
- Cabling
- Cooling plate
- Other?
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Granularity (Elton)
Minutes
Attending: