Difference between revisions of "Solenoid Controls Redesign"
From GlueXWiki
m |
m |
||
Line 3: | Line 3: | ||
* Infrastructure | * Infrastructure | ||
− | ** what goes into fourth rack | + | ** what goes into fourth rack besides computer? |
− | + | ||
− | + | ||
Line 22: | Line 20: | ||
*** change connection scheme? | *** change connection scheme? | ||
*** change current limiting scheme? | *** change current limiting scheme? | ||
+ | *** have fast and slow requirements, high and low voltage threshold requirements | ||
+ | **** 10 kHz Dataforth modules? attenuators? | ||
+ | *** discuss with engineers | ||
*** use local measurement and current-loop to bring it down? | *** use local measurement and current-loop to bring it down? | ||
** extend voltage measurement range using attenuators on separate Dataforth/PLC channels | ** extend voltage measurement range using attenuators on separate Dataforth/PLC channels | ||
Line 59: | Line 60: | ||
* VME-based fast DAQ | * VME-based fast DAQ | ||
** NI vs VME? | ** NI vs VME? | ||
+ | ** connection to PLC? | ||
+ | ** connection to EPICS? | ||
Line 64: | Line 67: | ||
* A-B HMI improvements | * A-B HMI improvements | ||
** fault sequence screens | ** fault sequence screens | ||
+ | ** Viewpoint | ||
+ | *** get screens on the web | ||
+ | *** security? | ||
+ | ** EWEB | ||
+ | *** create tag lists | ||
+ | *** security? | ||
Line 75: | Line 84: | ||
* EPICS | * EPICS | ||
** new channels | ** new channels | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Revision as of 16:03, 10 October 2011
To-do for solenoid controls redesign
- Infrastructure
- what goes into fourth rack besides computer?
- Cryo system
- need specs, new channels, new functionality, etc.
- Wiring
- document trip chains
- label circuit breakers
- use Sequence-Of-Events (SOE) module, need additional wiring and relays
- prototype use of SOE module and relays in controls test stand
- cross-talk on voltage tap channels
- change connection scheme?
- change current limiting scheme?
- have fast and slow requirements, high and low voltage threshold requirements
- 10 kHz Dataforth modules? attenuators?
- discuss with engineers
- use local measurement and current-loop to bring it down?
- extend voltage measurement range using attenuators on separate Dataforth/PLC channels
- should we use high-bandwidth Dataforth modules?
- should we monitor all relays? circuit breakers?
- Danfysik power supply
- do we want to go to Ethernet based control?
- choose ground fault detection mechanism
- address committee concerns
- dual fast dump switches?
- other redundancies?
- UPS on control boards and contactor?
- lockbox for key
- lock/tag/try for dump resistor
- procedures to check for dump resistor integrity and diode polarity
- Quench detector
- can we get a good balance?
- need sub-coil inductances in proper order
- do we need to design our own QD?
- Instrumentation
- implement system to isolate fault detectors and determine time sequence of trips
- monitor circuit breakers?
- implement RS232 connections to all devices (e.g. vacuum gauges)
- Use RTI 435NBX instead of Point I/O serial modules? Need to get one and test.
- VME-based fast DAQ
- NI vs VME?
- connection to PLC?
- connection to EPICS?
- A-B HMI improvements
- fault sequence screens
- Viewpoint
- get screens on the web
- security?
- EWEB
- create tag lists
- security?
- A-B PLC programming
- consider existing program a prototype, rework for 15-20 year lifetime
- custom ("add-on") instructions to simplify everything
- EPICS
- new channels
- UPS power
- to where
- solenoid controls racks
- target?
- downtime due to power loss is deciding factor
- to where
Notes
- max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec