(Created page with "== Action Items from previous meetings == # Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl) # Chris to check HV specs on coax cable....")
 
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
+
# <strike> Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl) </strike> Jack confirmed the instability was related to low photoelectron yields
# Chris to check HV specs on coax cable. (Needs to hold at least 80 V).
+
# <strike> Chris to check HV specs on coax cable. (Needs to hold at least 80 V). </strike> Greater than 200 V rms, breakdown voltage of 640 V.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 15:54, 13 October 2011

Action Items from previous meetings

  1. Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl) Jack confirmed the instability was related to low photoelectron yields
  2. Chris to check HV specs on coax cable. (Needs to hold at least 80 V). Greater than 200 V rms, breakdown voltage of 640 V.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: