Difference between revisions of "GlueX Start Counter Meeting, December 15, 2011"
(→Video Conferencing) |
(notes as minutes) |
||
Line 25: | Line 25: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ . You have to be a member of the "halld" Unix group to put files in this directory. | Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ . You have to be a member of the "halld" Unix group to put files in this directory. | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | New Note 27 | ||
+ | |||
+ | eric, puneet, werner | ||
+ | beni, mark | ||
+ | |||
+ | |||
+ | |||
+ | scintillators polishde, repolished | ||
+ | two slightly better, others destroyued | ||
+ | not happy | ||
+ | look for other companies | ||
+ | two companies in california | ||
+ | mcneil, or mcneal enterprises | ||
+ | E&F plastics | ||
+ | drawings sent to both, both say they can do it | ||
+ | E&F want to mill out of single piece of scint | ||
+ | $200 per | ||
+ | sent a good and a bad to both | ||
+ | they have been responsive | ||
+ | |||
+ | after polishing eric measured them | ||
+ | get 500 ps at far end | ||
+ | 300-500 ps over the length | ||
+ | with SiPM | ||
+ | |||
+ | ej204 ej212, same time resolution, | ||
+ | polished, improvment in attenuation length, samll improvment in time resolutions, ej212 thin pieces, ej204 is faster by 20%, longer attenuations length | ||
+ | 230 ps best | ||
+ | worst 500-600 ps | ||
+ | no wrapping | ||
+ | |||
+ | check that chuck on mailing list | ||
+ | |||
+ | plastic craft presses the scintillator | ||
+ | |||
+ | look at Werner's drawing | ||
+ | |||
+ | Beni: with no light guide, non-linearity when hits are near the end | ||
+ | Eugene suggest modularity |
Revision as of 15:39, 15 December 2011
GlueX Start Counter Meeting
Thursday, December 15, 2011
10 am EST
JLab: CEBAF Center, Room L207
Agenda
- Announcements
- Review minutes from previous meeting
- Prototype Report
- SiPM configuration
- Contract Status
- Simulation Status
Communication Information
Video Conferencing
- ESNet: 8542554 (non-standard)
- EVO:
- Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevnaeaBIsaaI9
- Phone Bridge ID: 11 7685
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-4Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ . You have to be a member of the "halld" Unix group to put files in this directory.
Minutes
New Note 27
eric, puneet, werner beni, mark
scintillators polishde, repolished two slightly better, others destroyued not happy look for other companies two companies in california mcneil, or mcneal enterprises E&F plastics drawings sent to both, both say they can do it E&F want to mill out of single piece of scint $200 per sent a good and a bad to both they have been responsive
after polishing eric measured them get 500 ps at far end 300-500 ps over the length with SiPM
ej204 ej212, same time resolution, polished, improvment in attenuation length, samll improvment in time resolutions, ej212 thin pieces, ej204 is faster by 20%, longer attenuations length 230 ps best worst 500-600 ps no wrapping
check that chuck on mailing list
plastic craft presses the scintillator
look at Werner's drawing
Beni: with no light guide, non-linearity when hits are near the end Eugene suggest modularity