Difference between revisions of "Minutes-1-5-2012"
From GlueXWiki
(Created page with "November 17, 2011 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_January_5_2012.xlsx Construction Tracking] (Dave) #* ...") |
|||
Line 9: | Line 9: | ||
#* Cooling system | #* Cooling system | ||
# Electronics update (Chris) | # Electronics update (Chris) | ||
− | #* [http://www.jlab.org/Hall-D/detector/fdc/electronics/LVscheme.pdf Vlad's | + | #* LV cabling [http://www.jlab.org/Hall-D/detector/fdc/electronics/LVscheme.pdf Vlad's scheme] |
− | + | # [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Simon) | |
− | # [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] ( | + | |
# Other | # Other | ||
Revision as of 18:19, 4 January 2012
November 17, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production update
- Second package tests (Lubomir)
- Engineering update (Bill)
- Cooling system
- Electronics update (Chris)
- LV cabling Vlad's scheme
- TDR (Simon)
- Other