Difference between revisions of "OWG Meeting 18-Jan-2012"
m |
|||
Line 50: | Line 50: | ||
==Announcements== | ==Announcements== | ||
+ | |||
+ | Hovanes noted that everyone should contact Fernando if they need electronics boards or equipment, and contact Hovanes if they need VME CPU's. He asks that you contact them at least three months in advance. | ||
Line 59: | Line 61: | ||
==Minutes== | ==Minutes== | ||
+ | |||
+ | Present: Elliott W, David L, Hovanes E, Beni Z, Somon T, Carl T, Mark I, Bryan M, Chris C, Dave A. | ||
+ | |||
+ | |||
+ | |||
+ | '''Software Review''' | ||
+ | |||
+ | The June software review will mainly be focused on the offline, but may cover some online topics. Stay tuned... | ||
+ | |||
+ | |||
+ | |||
+ | '''Counting House Installation''' | ||
+ | |||
+ | Hovanes and others reported that the UPS will arrive soon and installation is being scheduled, depends on when we officially get beneficial occupancy of the counting house. We likely will need a support frame under the UPS. About 19 racks are in the control room ready to be installed in the rack room. Power feeds are being designed. Networking, wireless and phones work in the office area, printer soon. Interim networking will be installed in the hall. We need to decide where we need clean vs UPS power. | ||
+ | |||
+ | |||
+ | |||
+ | '''12 GeV Project Lines''' | ||
+ | |||
+ | Elliott, David and Hovanes are working on completing the "Planning" lines in the 12GeV project schedule. Many documents are out or under review, most complete work on the corresponding line. The project ETC will be reviewed soon so the lines may change. | ||
+ | |||
+ | |||
+ | |||
+ | '''Configuration Database''' | ||
+ | |||
+ | David presented thoughts on the confDb first presented by Dmitry and Alex (see his slides for details). |
Revision as of 15:09, 24 January 2012
Agenda
- Announcements
- Review of minutes from 7-Dec-2011 meeting
- Software review 7,8-Jun - Mark, David, Elliott
- Counting house installation - Hovanes, Elliott
- furniture, phones, telecom, networking, racks, control room consoles, etc.
- Progress on 12GeV planning lines - David, Hovanes, Elliott
- ConDB, DAQ config, code mgmt, unblocking, event display, scripting, run info archive, storage mgmt
- Configuration database - David
- Elog and Accelerator division projects - Graham, Elliott
- DAQ group activities
- CODA3 alpha release - Graham, Dave A
- top-level ECS and gui - Vardan
- simulated raw event file - Dave A
- event disentangler - Carl
- automated readout list - Bryan
- EPICS - Hovanes, Nerses
- discriminator readout
- archiver
- alarm system
- backup/restore
- Controls
- Solenoid Controls Redesign - Yi, Elliott
- Magnet cold by Nov-2012
- PLC programming
- quench detector
- coil taps, fast/slow DAQ integration, Labview, CRio vs PXI, etc.
- FMEA and redundancy
- Solenoid Controls Redesign - Yi, Elliott
- Beam tests - Alex
- Controls test stand - Hovanes, Elliott
- FDC cosmic ray test - Beni, Elliott
- Midas Elog - Elliott
- Maintenance/modification elog
- Manual database
- Procedures database
- Electronics, trigger and DAQ status reports - Chris, Alex, Dave, Fernando, Ben, Ed, William, Bryan
- PyIrmis - release due in Feb
- Mantis Task Tracker
- AOT
Time/Location
1:30 PM Wed 18-Jan-2012 CC F326
Announcements
Hovanes noted that everyone should contact Fernando if they need electronics boards or equipment, and contact Hovanes if they need VME CPU's. He asks that you contact them at least three months in advance.
Next Meeting
1:30 PM Wed 1-Feb-2012 CC F326
Minutes
Present: Elliott W, David L, Hovanes E, Beni Z, Somon T, Carl T, Mark I, Bryan M, Chris C, Dave A.
Software Review
The June software review will mainly be focused on the offline, but may cover some online topics. Stay tuned...
Counting House Installation
Hovanes and others reported that the UPS will arrive soon and installation is being scheduled, depends on when we officially get beneficial occupancy of the counting house. We likely will need a support frame under the UPS. About 19 racks are in the control room ready to be installed in the rack room. Power feeds are being designed. Networking, wireless and phones work in the office area, printer soon. Interim networking will be installed in the hall. We need to decide where we need clean vs UPS power.
12 GeV Project Lines
Elliott, David and Hovanes are working on completing the "Planning" lines in the 12GeV project schedule. Many documents are out or under review, most complete work on the corresponding line. The project ETC will be reviewed soon so the lines may change.
Configuration Database
David presented thoughts on the confDb first presented by Dmitry and Alex (see his slides for details).