(Created page with "== Action Items from previous meetings == # Populate interface cards to the ADC (Chris) # Complete 3 remaining boards for SiPM testing (Chris) == Tentative Agenda == # Announc...")
 
(Action Items from previous meetings)
Line 3: Line 3:
 
# Populate interface cards to the ADC (Chris)
 
# Populate interface cards to the ADC (Chris)
 
# Complete 3 remaining boards for SiPM testing (Chris)
 
# Complete 3 remaining boards for SiPM testing (Chris)
 +
# Determine if swapped bias pins was accidental or in design (Chris)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 18:31, 26 January 2012

Action Items from previous meetings

  1. Populate interface cards to the ADC (Chris)
  2. Complete 3 remaining boards for SiPM testing (Chris)
  3. Determine if swapped bias pins was accidental or in design (Chris)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)
  10. SiPM testing (Ivan)