Difference between revisions of "Feb 28, 2012 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 35: | Line 35: | ||
##* LG gluing schedule and LED attachment by tape | ##* LG gluing schedule and LED attachment by tape | ||
# USM update | # USM update | ||
+ | ## [https://halldweb1.jlab.org/wiki/images/e/e1/02_28_my_pres_Hall-D.pdf Station 3: Crosstalk vs. temperature (Hayk)] | ||
# TDR update | # TDR update | ||
## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). |
Revision as of 12:10, 28 February 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday. We went through a variety of issues regarding coating and assembly. They appear to understand where their procedure is deficient. Again, they are saying all the right things. The big question is: will the next batch of boards show improvements in production quality? We'll see.
- Beam tests in Hall B (John)
- small note on distance from CLAS scintillators by Kei
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- BCAL Beam Tests 2012
- LG gluing schedule and LED attachment by tape
- BCAL Beam Tests 2012
- USM update
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Simulations/Reconstruction
- Any other business
Minutes
Attending: