Difference between revisions of "BLTWG Meeting 03/05/2012"
From GlueXWiki
(→Agenda) |
|||
Line 11: | Line 11: | ||
#* Glasgow goniometer + ladder | #* Glasgow goniometer + ladder | ||
#** [http://nuclear.gla.ac.uk/~kl/GlueX/goni_newport_comments.gif 1st iteration of Newport design] | #** [http://nuclear.gla.ac.uk/~kl/GlueX/goni_newport_comments.gif 1st iteration of Newport design] | ||
+ | #* ASU polarimeter | ||
+ | #** [http://nuclear.gla.ac.uk/~kl/triplet/ring_a1.jpg Strip detector from Mainz, MIDAS detector (Added by Ken)] | ||
+ | #** [http://nuclear.gla.ac.uk/~kl/triplet/triplet4.gif Possible setup for Mainz polarimiter test (Added by Ken)] | ||
#* UConn diamonds | #* UConn diamonds | ||
#* UConn electronics | #* UConn electronics | ||
#* UConn microscope | #* UConn microscope | ||
#* CUA hodoscope | #* CUA hodoscope | ||
− | |||
− | |||
− | |||
#* UNCW/JLab pair counters | #* UNCW/JLab pair counters | ||
#* JLab pair spectrometer, target | #* JLab pair spectrometer, target |
Revision as of 12:12, 5 March 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 487 3954)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- UConn construction SOW, draft budget - Richard
- Reports from working groups
- Glasgow goniometer + ladder
- ASU polarimeter
- UConn diamonds
- UConn electronics
- UConn microscope
- CUA hodoscope
- UNCW/JLab pair counters
- JLab pair spectrometer, target
- Initial Calibration and Alignment Discussions
- Alignment issues with the tagger system?
- Energy calibration for the tagging system?
- End point energy?