Difference between revisions of "June 25, 2012 PID Upgrade"
From GlueXWiki
(→Connections) |
(→Agenda) |
||
Line 23: | Line 23: | ||
# Status of Hardware Designs in GEANT | # Status of Hardware Designs in GEANT | ||
# Status of Kinematic Fitting | # Status of Kinematic Fitting | ||
+ | # Pythia event kinematics: [https://halldweb1.jlab.org/halld_pythia_kin_plots/ plots] | ||
# AOT | # AOT |
Revision as of 11:23, 25 June 2012
Meeting Time and Place
Monday June 25, 2012 at 1:30pm At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- ) EVO: A conference has been booked under "GlueX PID Upgrade" from 12:30pm until 4:00pm (EDT).
- ) To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 138802. Instructions for the
- )Phone Bridge to EVO.
- ) Skype Bridge to EVO
- )To connect by telephone, dial:
- ) You can look up toll-free number at http://www.readytalk.com/intl
- ) US and Canada: (866)740-1260 (toll free)
- ) International: (303)248-0285 (toll call)
- ) enter access code followed by the # sign: 3421244#
Agenda
- Announcements
- PAC 39 Results
- Status of Hardware Designs in GEANT
- Status of Kinematic Fitting
- Pythia event kinematics: plots
- AOT