Difference between revisions of "Minutes-7-12-2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 5: Line 5:
 
#* Fourth package tests
 
#* Fourth package tests
 
#* Spare wire frames
 
#* Spare wire frames
#* First package refurbishment
 
 
#* Third package preparation
 
#* Third package preparation
 
# Engineering update (Bill)
 
# Engineering update (Bill)
 
#* Cooling system
 
#* Cooling system
 
# Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
 
# Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
# Gas system status (Beni)
+
# Gas system update (Beni)
 
# Test set-up in 126 (Beni)
 
# Test set-up in 126 (Beni)
 
# Other
 
# Other

Revision as of 18:40, 11 July 2012

July 12, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Fourth package tests
    • Spare wire frames
    • Third package preparation
  2. Engineering update (Bill)
    • Cooling system
  3. Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
  4. Gas system update (Beni)
  5. Test set-up in 126 (Beni)
  6. Other