− | ''Attending: | + | ''Attending: Jack, Elton, Jim, Eugene, Fernando, Ivan, Chris, Yi |
− | + | ||
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
+ | #* Yesterday we received the second shipment of 600 SiPMs from USM. They sailed through customs | ||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
#* SiPMs assignment for new boards | #* SiPMs assignment for new boards | ||
+ | #* Shaun Krueger (student from UofR) has made a list of 80 SiPMs to be fitted to the pre-production boards | ||
+ | #* Shaun has also compiled an assignment list of SiPMs to electronic boards for all 4000 sensors. | ||
+ | #* Shaun's approach is to group SiPMs according to Vop. | ||
+ | #* Replaced one R2 resistor with a fixed ~6KOhm resistor to compensate for low precision resistor value. Result is a 3 resistor trim, but covers the range needed | ||
+ | #* Pre-production boards will be different from the production boards to avoid changing many resistors. Only one resistor per SiPM needs to be changed on the pre-production board. | ||
+ | #* Final production units will have fixed values for the trim resistors, but different from the ones on the pre-production modules. | ||
# Mechanical assembly (Jim) | # Mechanical assembly (Jim) | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) | ||
+ | #* Generated | ||
# Electronic boards (Chris) | # Electronic boards (Chris) | ||
+ | # Electronic boards (Fernando) | ||
+ | #* Need to find a good way of storing the SiPMs in preparation for installation | ||
# Light guide gluing setup (Scot via e-mail) | # Light guide gluing setup (Scot via e-mail) | ||
#* I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today. | #* I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today. | ||
#* I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682 | #* I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682 |
Revision as of 18:29, 9 August 2012
Action Items from previous meetings
-
Develop front and back views of jumper sheets. (Jack)- This specifically includes the settings for the pre-production boards that are needed by Wed of next week.
- Test wrapping forms (Elton)
-
Order glue (and any other consumables) to glue light guides (Scot) -
Check new gluing jig for the light guides (Scot and Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
- I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today.
- I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682
Minutes
Attending: Jack, Elton, Jim, Eugene, Fernando, Ivan, Chris, Yi
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Yesterday we received the second shipment of 600 SiPMs from USM. They sailed through customs
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Shaun Krueger (student from UofR) has made a list of 80 SiPMs to be fitted to the pre-production boards
- Shaun has also compiled an assignment list of SiPMs to electronic boards for all 4000 sensors.
- Shaun's approach is to group SiPMs according to Vop.
- Replaced one R2 resistor with a fixed ~6KOhm resistor to compensate for low precision resistor value. Result is a 3 resistor trim, but covers the range needed
- Pre-production boards will be different from the production boards to avoid changing many resistors. Only one resistor per SiPM needs to be changed on the pre-production board.
- Final production units will have fixed values for the trim resistors, but different from the ones on the pre-production modules.
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Generated
- Electronic boards (Chris)
- Electronic boards (Fernando)
- Need to find a good way of storing the SiPMs in preparation for installation
- Light guide gluing setup (Scot via e-mail)
- I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today.
- I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682