(Action Items from previous meetings)
Line 3: Line 3:
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
 
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
 
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
# Investigate source of discrepancy between measured and predicted test voltages on wedge boards (Jack)
+
# <strike> Investigate source of discrepancy between measured and predicted test voltages on wedge boards (Jack) </strike>
# Resort the SiPMs according to input bias groups to make sure the maps correspond to the spread sheets.
+
# <strike> Resort the SiPMs according to input bias groups to make sure the maps correspond to the spread sheets. </strike>
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
Line 19: Line 19:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Jack, Fernando, Scot, Nick, Jim, Ivan, Yi, Elton.
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# mini-Bcal (Elton)
 +
# SiPM production testing (Yi)
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Fernando and Chris)
 +
# Light guide gluing setup (Scot)

Revision as of 16:37, 13 September 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
  3. Investigate source of discrepancy between measured and predicted test voltages on wedge boards (Jack)
  4. Resort the SiPMs according to input bias groups to make sure the maps correspond to the spread sheets.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: Jack, Fernando, Scot, Nick, Jim, Ivan, Yi, Elton.

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)