# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
# Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | # Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi) | ||
− | # Investigate source of discrepancy between measured and predicted test voltages on wedge boards (Jack) | + | # <strike> Investigate source of discrepancy between measured and predicted test voltages on wedge boards (Jack) </strike> |
− | # Resort the SiPMs according to input bias groups to make sure the maps correspond to the spread sheets. | + | # <strike> Resort the SiPMs according to input bias groups to make sure the maps correspond to the spread sheets. </strike> |
== Tentative Agenda == | == Tentative Agenda == | ||
Line 19: | Line 19: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Jack, Fernando, Scot, Nick, Jim, Ivan, Yi, Elton. |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # mini-Bcal (Elton) | ||
+ | # SiPM production testing (Yi) | ||
+ | # Mechanical assembly (Jim) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Electronic boards (Fernando and Chris) | ||
+ | # Light guide gluing setup (Scot) |
Revision as of 16:37, 13 September 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
-
Investigate source of discrepancy between measured and predicted test voltages on wedge boards (Jack) -
Resort the SiPMs according to input bias groups to make sure the maps correspond to the spread sheets.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: Jack, Fernando, Scot, Nick, Jim, Ivan, Yi, Elton.
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)