== Production == | == Production == | ||
− | - Dave: | + | - Dave: Last production package (#2) assembled! Redundant components: working on three more cathodes. Starting next week Tina will work for BCAL, but will be available from time to time so that we can finish the rest of the cathodes. Casey finished with the lamination of wire frame #31 and now is gluing #32 (the last one). Anatoly is installing the caps on #31. |
- How many redundant cells we want to make: according to the schedule 4, but most likely we have parts for 6. According to Dave we will need 5 more man-weeks to make four additional cathodes. As for the wire planes we anticipated having 7 of them, three of which with high dark current ~1 uA but stable, that probably can be fixed. Eugene agreed to build 6 spare cells. | - How many redundant cells we want to make: according to the schedule 4, but most likely we have parts for 6. According to Dave we will need 5 more man-weeks to make four additional cathodes. As for the wire planes we anticipated having 7 of them, three of which with high dark current ~1 uA but stable, that probably can be fixed. Eugene agreed to build 6 spare cells. |
Revision as of 12:31, 18 January 2013
January 17, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production status
- Plans for spare parts [1]
- Basis of Estimate for the FDC activities ,guideline (Lubomir, Bill, Dave)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Fourth package tests FDC E-log Entry 101
- Other