− | Participants: | + | Participants: Bill, Dave, Chris, Nick, Simon, Beni, and Lubomir. |
== Production == | == Production == | ||
− | - Dave: | + | - Dave: some issues with tensioning mylar on type-2 cathode: bubbles appeared and mylar has to be replaced. Tina will come again this week(end?) to finish the cutting of all the foils needed for the spare cathodes. Casey and Dave will string the last wire frame. On Monday Chris will put the components on the second last wire frame. |
− | - Lubomir for package #2: | + | - Lubomir for package #2: despite replacing sense wire 37 on the second cell, it showed a noise this time very close to the HV end (Down strip #15, Upper strip #3). On Monday we opened the package for a fourth time. During this operation, an O-ring with Apizon fall |
− | + | ||
== Basis of Estimate for the FDC == | == Basis of Estimate for the FDC == |
Revision as of 18:31, 7 February 2013
February 7, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #2 testing (Lubomir)
- Basis of Estimate for the FDC activities cabling manhours (Lubomir, Bill, Dave)
- Corrosion tests at MePhi latest results (Lubomir)
- Engineering [1], [2], [3], [4], [5], [6] (Bill)
- Electronics (Nick)
- Tests at EEL126 FDC E-log (Beni)