Difference between revisions of "Minutes-2-7-2013"
From GlueXWiki
Line 29: | Line 29: | ||
== Basis of Estimate for the FDC == | == Basis of Estimate for the FDC == | ||
− | - | + | - New version of the BOE is linked above with the breakdown of the man-weeks. During the discussions Bill added for some activities the engineer-weeks. |
− | == Corrosion test == | + | == Corrosion test at MePhi == |
− | - | + | - Already 10 days Viton and Viton+Apiezon samples are OK, while the EPDMs failed on the first day. Vlad wants to keep the test running till the two Viton+Apiezon ssmples die. |
− | + | ||
− | + | ||
== Engineering == | == Engineering == |
Revision as of 19:05, 7 February 2013
February 7, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #2 testing (Lubomir)
- Basis of Estimate for the FDC activities cabling manhours (Lubomir, Bill, Dave)
- Corrosion tests at MePhi latest results (Lubomir)
- Engineering [1], [2], [3], [4], [5], [6] (Bill)
- Electronics (Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other