Difference between revisions of "Minutes-4-4-2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "April 4, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_4_2013.xlsx Construction Tracking] (Dave) #* Package...")
 
Line 5: Line 5:
 
#* Package #3 repair
 
#* Package #3 repair
 
# Installation (Lubomir, Bill)
 
# Installation (Lubomir, Bill)
#* Cable installation
+
#* Cable installation: Richard's models [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC-CDC_WIRE_PRE-INSTALLED.pdf],  [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_WIRE_FDC_OFF_CART.pdf],  [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_WIRE_INSTALLED.pdf]
 
#* Plans for practicing at Blue Crab  
 
#* Plans for practicing at Blue Crab  
 
# Engineering (Bill)
 
# Engineering (Bill)

Revision as of 11:10, 4 April 2013

April 4, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Package #3 repair
  2. Installation (Lubomir, Bill)
    • Cable installation: Richard's models [1], [2], [3]
    • Plans for practicing at Blue Crab
  3. Engineering (Bill)
    • Cooling system status
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other