Difference between revisions of "Minutes-4-18-2013"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 10: | Line 10: | ||
#* Cooling system tests | #* Cooling system tests | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
− | # Full electronics tests | + | # Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] |
# Other | # Other | ||
Revision as of 18:00, 17 April 2013
April 18, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Third package status
- Installation (Lubomir, Bill)
- FDC installation document
- Practicing at Blue Crab
- Engineering (Bill)
- Cooling system tests
- Electronics (Chris, Nick)
- Full electronics tests FDC E-log
- Other