Difference between revisions of "Minutes-4-25-2013"
From GlueXWiki
Line 11: | Line 11: | ||
#* Practicing at Blue Crab | #* Practicing at Blue Crab | ||
# Engineering (Bill) | # Engineering (Bill) | ||
− | #* Cooling system tests | + | #* Cooling system tests [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0395.jpg], [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0397.jpg], [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0400.jpg] |
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | # Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) |
Revision as of 15:36, 25 April 2013
April 25, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Third package status
- Spare package
- Corrosion tests at MePhi: results, [1], [2], [3], [4], [5], [6], [7]
- Installation (Lubomir, Bill)
- FDC installation document
- Practicing at Blue Crab
- Engineering (Bill)
- Electronics (Chris, Nick)
- Full electronics tests FDC E-log (Beni)
- Other