Difference between revisions of "Minutes-10-10-2013"
From GlueXWiki
Line 21: | Line 21: | ||
Also, we will need more people when pulling/pushing the cables through these holes. | Also, we will need more people when pulling/pushing the cables through these holes. | ||
− | - We discussed what to do with the systems that are absolutely needed for the FDC installation but will not be ready before the installation starts: gas, electric power and cooling. Gas: Dave will check what has been installed and how it can be modified. Beni: if some of the 500 ccpm flow controllers have been installed already then we don't have enough for a temporary gas system | + | - We discussed what to do with the systems that are absolutely needed for the FDC installation but will not be ready before the installation starts: gas, electric power and cooling. Gas: Dave will check what has been installed and how it can be modified. Beni: if some of the 500 ccpm flow controllers have been installed already then we don't have enough for a temporary gas system. Electric power: for the LV crate we need 208V which would require a portable transformer. Fernando volunteered to check the availability and what else is required to power the LV crate (the minimum needed to start cabling). |
+ | |||
+ | - The moving date will depend on the readiness of the above (temporary or permanent) systems. In any case it can't be next week (Eugene) because in case of a shutdown the FDC better be in the EEL. Eugene needs information from Lubomir and Beni to include the FDC check (of the gas flow) in the lists of the critical tasks in case of a shutdown. The AC in 126 is already included. | ||
== Engineering == | == Engineering == | ||
− | - Bill | + | - The skin between the FDC packages has been installed by Bill and Casey, also Tina today. Tomorrow (probably) Casey will install the tubes between the cooling manifolds. |
== Electronics == | == Electronics == | ||
− | - | + | - Half of the signal cables have been labeled by the summer students and we decided to label the rest. The cables for one package were moved from Blue Crab in August and can be labeled. The rest of the cables (also one package) has been used for the full electronics test. We started disconnecting these cables and most are packed back in their original boxes in 126. When Beni is done with the F1TDC test next week we will finish the rest. |
== Tests at EEL126 == | == Tests at EEL126 == | ||
− | - | + | - Beni showed his results of the F1TDC tests in the following configuration: two regular cells (3 and 6) with +HV of 2150 |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + |
Revision as of 18:12, 10 October 2013
October 10, 2013 FDC meeting
Agenda
- Installation preparations [1] (all)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests in EEL126
- New F1TDC FDC E-log Entry 117 (Beni)
- Other