Difference between revisions of "Photon Beam"
From GlueXWiki
Line 30: | Line 30: | ||
* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-tagger/ browse mailing list archives] | * [http://www.jlab.org/ccc/mail_archives/HALLD/halld-tagger/ browse mailing list archives] | ||
* [[Private:BLTWG membership|working group members (private)]] | * [[Private:BLTWG membership|working group members (private)]] | ||
− | + | ||
+ | ==Reference documents== | ||
* [[Tagged Beam Group Engineering Drawings|engineering drawings]] | * [[Tagged Beam Group Engineering Drawings|engineering drawings]] | ||
+ | * [[rack locations in the tagger hall]] | ||
* [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]] | * [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]] | ||
* [[Alignment and Calibration|alignment and calibration]] | * [[Alignment and Calibration|alignment and calibration]] | ||
− | * [[Beam Commissioning Plan]] | + | * [[Beam Commissioning Plan|beam commissioning plan]] |
==Accelerator Information== | ==Accelerator Information== |
Revision as of 11:12, 23 June 2014
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
Working Group Information
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
Reference documents
- engineering drawings
- rack locations in the tagger hall
- microscope readout cable lengths and routes
- alignment and calibration
- beam commissioning plan
Accelerator Information
- Accelerator - Hall D Interface Document (draft - 2008)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- Links to Accelerator Beamline Drawings