Line 50: | Line 50: | ||
* Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]] | * Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]] | ||
** CDC [https://logbooks.jlab.org/entry/3291616 Curved Tracks] 650A Solenoid Current | ** CDC [https://logbooks.jlab.org/entry/3291616 Curved Tracks] 650A Solenoid Current | ||
− | ** FDC [http://www.jlab.org/Hall-D/detector/fdc/DAQ/run127_ext2_ev3355_2.pdf horizontal shower event] | + | ** FDC [http://www.jlab.org/Hall-D/detector/fdc/DAQ/hit3D_run126_ext1_ev2673_2.dat scattering event], [http://www.jlab.org/Hall-D/detector/fdc/DAQ/run127_ext2_ev3355_2.pdf horizontal shower event] |
** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]] | ** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]] | ||
* PID | * PID |
Revision as of 11:12, 20 August 2014
Contents
Meeting Time and Place
The meeting will be on Wednesday August 20, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Readiness Review August 26-28, 2014
- Collaboration Meeting October 2-4, 2014
- Solenoid
Running in Fall 2014
- Coordination
- Run Coordinator - Alexandre Deur
- Physics Division Liaison - Yi Qiang
- Shift Scheduler - Reinhard Schumacher
- Analysis Coordinator - Volker Crede or designate from Physics group.
- Plans
- Manpower
- Shift Schedule site available next week.
- We need to schedule early October to early December, actual run is 3 weeks.
Ongoing Activities
- Technical Construction Report
- Solenoid Current Studies
Reports from Technical Groups
- Calorimeters: August 14, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction August 7, 2014
- Tracking Joint FDC/CDC Meeting August 14, 2014
- CDC Curved Tracks 650A Solenoid Current
- FDC scattering event, horizontal shower event
- FADC FPGA July 22, 2014
- PID
- TOF August 12, 2014
- [ https://logbooks.jlab.org/entry/3289258 Logbook entry of TOF cosmic trigger]
- Start Counter July 24, 2014
- PID Upgrades August 15, 2014
- TOF August 12, 2014
- DAQ/Monitoring/Controls July 30, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) July 30, 2014
- Software (Level-3) June 10, 2014
- Offline Software
- Offline August 6, 2014
- Calibration August 13, 2014
- Photon Beam and Tagger August 18, 2014