Difference between revisions of "September 22, 2014"
From GlueXWiki
Line 1: | Line 1: | ||
[https://halldweb1.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan] | [https://halldweb1.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan] | ||
+ | |||
* CTP installation and testing | * CTP installation and testing | ||
Line 5: | Line 6: | ||
* Test of the global trigger distribution (using BCAL north crates) | * Test of the global trigger distribution (using BCAL north crates) | ||
− | + | :* Global energy sum | |
*: BCAL cosmic trigger | *: BCAL cosmic trigger |
Revision as of 09:49, 22 September 2014
- CTP installation and testing
- Test of the global trigger distribution (using BCAL north crates)
- Global energy sum
- BCAL cosmic trigger
- BCAL cosmic trigger for FDC / CDC
- Trigger calibration status from sub-detectors
- TAGM/TAGH setups
- Start Counter
- Pair Spectrometer
- Trigger monitoring