Revision as of 09:55, 22 September 2014
- CTP installation and testing
- Test of the global trigger distribution (using BCAL north crates)
- Global energy sum
- BCAL cosmic trigger for FDC / CDC
- Trigger calibration status from sub-detectors
- TAGM/TAGH setups
- Start Counter
- Pair Spectrometer
- Trigger monitoring