Difference between revisions of "February 9, 2015"
From GlueXWiki
Line 8: | Line 8: | ||
:: - corrected trigger scalers on TS | :: - corrected trigger scalers on TS | ||
* Trigger algorithm study for the spring run | * Trigger algorithm study for the spring run | ||
− | |||
− | |||
− | |||
− | |||
− | |||
: FCAL thresholds tuning | : FCAL thresholds tuning | ||
::: - check rates with MC simulation (MC) | ::: - check rates with MC simulation (MC) | ||
Line 20: | Line 15: | ||
::: - energy correlation with BCAL | ::: - energy correlation with BCAL | ||
::: - combined trigger base on BCAL/ST correlations and FCAL thresholds | ::: - combined trigger base on BCAL/ST correlations and FCAL thresholds | ||
− | + | : FCAL trigger tuning | |
+ | :: decreasing integration window size (time). | ||
+ | ::: - propagation time for MIPs (MC simulation) | ||
+ | ::: - cable length, PMT transit time spread | ||
+ | ::: - check with acquired data | ||
* Level-1 Monitor | * Level-1 Monitor |
Revision as of 10:48, 9 February 2015
- Firmware update and algorithm testing
- - TI, FADC250 (PS/PSC, BCAL, ST, TAGM/TAGH)
- - Change jumpers/switches on SD boards (Sergei P.)
- - connect TI trigger front panel output to F1 TDCs
- - Check trigger performance with play back - in progress
- - PS play back
- - new threshold implementation for trigger and scalers on fadc250
- - corrected trigger scalers on TS
- Trigger algorithm study for the spring run
- FCAL thresholds tuning
- - check rates with MC simulation (MC)
- - MIP response
- Coincidence of FCAL with other sub-detectors
- - require tracks in ST
- - energy correlation with BCAL
- - combined trigger base on BCAL/ST correlations and FCAL thresholds
- FCAL trigger tuning
- decreasing integration window size (time).
- - propagation time for MIPs (MC simulation)
- - cable length, PMT transit time spread
- - check with acquired data
- decreasing integration window size (time).
- Level-1 Monitor