Difference between revisions of "GlueX TOF Meeting, July 21, 2011"
From GlueXWiki
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
Line 13: | Line 13: | ||
# Prototype Status [http://hadron.physics.fsu.edu/~ostrov/tof/20110721/] | # Prototype Status [http://hadron.physics.fsu.edu/~ostrov/tof/20110721/] | ||
# Contract Status | # Contract Status | ||
− | #* [ | + | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1713 Schedule] |
Line 63: | Line 63: | ||
==Time-Walk Correction Tests== | ==Time-Walk Correction Tests== | ||
− | Sasha tried out the technique that Elton described in a [ | + | Sasha tried out the technique that Elton described in a [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1719 recent note]. See [https://halldweb.jlab.org/talks/2011-3Q/Time-walk%20corrections.html his plots] for details. Cosmic data taken with prototype counters show some of the general features expected, but there is a non-Laudau distributed background in the sample that complicates the fits. |
Latest revision as of 17:01, 24 February 2017
Contents
Location, Time
NOTE: new standard room, date, and time!
Thursday, July 21, 2011
10:00 am EDT
JLab: CEBAF Center, Room F326
Agenda
- Announcements
- Minutes from the last meeting
- Prototype Status [1]
- Contract Status
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- direct meeting link
- Phone Bridge ID: 10 4388
Telephone
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-3Q/ .
Minutes
Present:
- FSU: Paul Eugenio, Sasha Ostrovidov
- JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann
Construction
- Ian Winger sent Chuck a 3-D drawing of the split light guides.
- Paul will be busy with his DOE annual for the next week or so.
- Three more light guides have been made from the UVT material.
- These will be compared to non-UVT versions.
- FSU Physics machine shop playing with procedure for fabrication.
- They are getting good finishes with the new bit.
- One light guide, was sent to Polymer Plastics for vapor polishing. It was due back this week.
- Paul has talked to folks at Eljen about how they do polishing
- Although vapor polishing will give good results, it is likely not better than hand polishing.
- Paul purchased got some polishing compounds to try.
- The Physics Department bought a new buffing station suitable for light guides.
- No testing with the new light guides has been done yet.
- Paul will send Chuck the dimenions of the steel tube.
Contract
Paul prepared a version of the statement of work, but the text was lost. Mark volunteered to write a draft.
Time-Walk Correction Tests
Sasha tried out the technique that Elton described in a recent note. See his plots for details. Cosmic data taken with prototype counters show some of the general features expected, but there is a non-Laudau distributed background in the sample that complicates the fits.