Difference between revisions of "April 4, 2015"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
::: - FCAL  (2 days)
 
::: - FCAL  (2 days)
 
::::  Performed threshold scans for noise/cosmic runs [[https://logbooks.jlab.org/entry/3328066 Log entry]]
 
::::  Performed threshold scans for noise/cosmic runs [[https://logbooks.jlab.org/entry/3328066 Log entry]]
 +
: [[Media:fcal_cosmic1.pdf | FCAL cosmic]]
 +
: [[Media:fcal_cosmic2.pdf]]
 
::: - BCAL  (1 day)
 
::: - BCAL  (1 day)
 
::: - FCAL & BCAL (1 day)
 
::: - FCAL & BCAL (1 day)

Revision as of 09:44, 6 April 2015

  • Trigger Commissioning Plan
  1. Integrate PS trigger to the global DAQ (1 - 2 days)
  2. Tune trigger parameters (trigger threshold scans, tune timing offsets) and study performance for
- FCAL (2 days)
Performed threshold scans for noise/cosmic runs [Log entry]
FCAL cosmic
Media:fcal_cosmic2.pdf
- BCAL (1 day)
- FCAL & BCAL (1 day)
- ST and TOF (1 day)
- Coincidence of FCAL/BCAL and ST/TOF (2 days)
- Multiple triggers in the system (2-3 days)
Trigger hit-pattern is written to the trigger record
  • Trigger Monitoring
Trigger Rates
Sub-detector scalers
- Use config files to initialize electronics modules
Sub-detector scalers