Difference between revisions of "July 15, 2015 Calibration"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 53: | Line 53: | ||
# Subdetector Reports | # Subdetector Reports | ||
# [[Spring_2015_Commissioning_Simulations|Simulations]] | # [[Spring_2015_Commissioning_Simulations|Simulations]] | ||
+ | # Action Item Review | ||
# AOB | # AOB | ||
+ | |||
+ | == Action Items == | ||
+ | |||
+ | * Produce updated calibration plots and performance numbers, preferably within a week. | ||
+ | * Polish calibration routines, including testing of results, documentation (GlueX note). | ||
+ | * Update simulation parameters. |
Revision as of 17:35, 14 July 2015
GlueX Calibration Meeting
Wednesday, July 1, 2015
11:00 am, EDT
JLab: CEBAF Center, F326
Communication Information
Remote Connection
You can connect using BlueJeans using the meeting number 630 804 895 . (Click "Expand" to the right for more details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 630804895
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
- Use *4 to unmute
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2015
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2015/ .
Agenda
- Announcements
- Calibration Processing
- Potential uses of git?
- Run quality criteria
- Subdetector Reports
- Simulations
- Action Item Review
- AOB
Action Items
- Produce updated calibration plots and performance numbers, preferably within a week.
- Polish calibration routines, including testing of results, documentation (GlueX note).
- Update simulation parameters.