Difference between revisions of "2016-03-16"
From GlueXWiki
(→Run Planning for Spring 2016) |
(→Run Planning for Spring 2016) |
||
Line 23: | Line 23: | ||
=== Run Planning for Spring 2016 === | === Run Planning for Spring 2016 === | ||
* [[Run Coordination Meetings: Spring 2016 Run]] | * [[Run Coordination Meetings: Spring 2016 Run]] | ||
− | *'''Progress report for the last two weeks''': [[File:RC_report_gluex_weekly_march16_2016.pdf| | + | *'''Progress report for the last two weeks''': [[File:RC_report_gluex_weekly_march16_2016.pdf|51px|thumb|center| ]] |
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run#Runplan_time_charts_.28readjusted_after_CHL_repair_started_on_March_9th.29 Time charts for the last 4 weeks, readjusted for the CHL repair] | *[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run#Runplan_time_charts_.28readjusted_after_CHL_repair_started_on_March_9th.29 Time charts for the last 4 weeks, readjusted for the CHL repair] | ||
* [http://www.jlab.org/Hall-D/shifts Shift Schedule] | * [http://www.jlab.org/Hall-D/shifts Shift Schedule] |
Revision as of 11:11, 16 March 2016
Contents
Meeting Time and Place
The meeting will be on Wednesday March 16, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Update
- Nuclear Photoproduction with GlueX April 28-29
- Collaboration Meeting May 9-11
- Analysis Workshop after May Collaboration Meeting, May 11-13
Run Planning for Spring 2016
- Run Coordination Meetings: Spring 2016 Run
- Progress report for the last two weeks: File:RC report gluex weekly march16 2016.pdf
- Time charts for the last 4 weeks, readjusted for the CHL repair
- Shift Schedule
Analysis Activities
- Results from the Spring 2016 Run.
- Photon Polarization (Justin Stevens)
- Reconstruction Results (Simon Taylor & Others)
- Offline Activities March 2, 2016
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration March 9, 2016 - Calibration Dashboard
- Calibration Passes on Data
- Physics and Analysis March 7, 2016
- Physics Working Group
- Analysis Activities Reaction page with plugins
Data Acquisition and Electronics Systems
- Online Systems January 27, 2016
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger
- Electronics and Trigger
- Electronics Update
- FADC FPGA Jan 28, 2016
- Level-1 Trigger
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status March 14, 2016
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter January 28, 2016
- Tracking March 10, 2016
- CDC
- FDC
- Calorimeters: March 10, 2016
- BCAL
- FCAL
- TOF March 8, 2016
- DIRC System March 11, 2016 PID Upgrade
Other Activities
- AOT