Difference between revisions of "Run Planning Meeting Notes, March 27-April 2, 2016"
From GlueXWiki
(→Tuesday, March 29) |
(wed.) |
||
Line 1: | Line 1: | ||
+ | ==Wednesday, March 30== | ||
+ | |||
+ | # Accelerator Status | ||
+ | ## Problem with RF separation yesterday | ||
+ | ##* Beam taken away for RF work, 4 pm - 10 pm | ||
+ | ##* Go back to work on issue today | ||
+ | ## beam studies scheduled for Thursday | ||
+ | # Hall-D/GlueX items | ||
+ | ## FCAL gain/calibration mystery (Adesh) | ||
+ | ## gluonraid space (David) | ||
+ | ## new microscope bias voltages (Richard) | ||
+ | ## fluctuating DAQ livetime | ||
+ | ## production running with tagger quad. current variation, deferred (Richard) | ||
+ | ## other systems? | ||
+ | # Run Plan | ||
+ | #* 10:00 transmission studies | ||
+ | #* ??:?? trigger studies | ||
+ | # Offline analysis? | ||
+ | # Administrative Items | ||
+ | ## Run List, Paper Form | ||
+ | # AOB? | ||
+ | |||
==Tuesday, March 29== | ==Tuesday, March 29== | ||
Revision as of 08:29, 30 March 2016
Wednesday, March 30
- Accelerator Status
- Problem with RF separation yesterday
- Beam taken away for RF work, 4 pm - 10 pm
- Go back to work on issue today
- beam studies scheduled for Thursday
- Problem with RF separation yesterday
- Hall-D/GlueX items
- FCAL gain/calibration mystery (Adesh)
- gluonraid space (David)
- new microscope bias voltages (Richard)
- fluctuating DAQ livetime
- production running with tagger quad. current variation, deferred (Richard)
- other systems?
- Run Plan
- 10:00 transmission studies
- ??:?? trigger studies
- Offline analysis?
- Administrative Items
- Run List, Paper Form
- AOB?
Tuesday, March 29
- Accelerator Status
- Problem with RF 2L07-7 overnight, control module replaced
- today after lunch: spin studies, will have few interruptions of 15 min. each
- beam studies scheduled for Thursday
- Hall-D/GlueX items
- beam issues
- drifting y-position
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- Solenoid magnet trip, Mon. 9 am
- FCAL field dependence study data being taken yesterday (Adesh)
- pair spectrometer study while ramping: deferred
- gluonraid space
- other systems?
- beam issues
- Run Plan
- Tuesday
- 10:00 study photon beam intensity as function of locks, polarization
- 12:00 trigger studies
- 16:00 transmission studies
- 17:00 production running
- Wednesday
- 00:00 production running with tagger quad. current variation
- Tuesday
- Offline analysis?
- Administrative Items
- Standard Conditions
- Google Calendar
- AOB?
Monday, March 28
- Accelerator Status
- started beam delivery Sunday
- today: Hall B 1-pass extraction work will interrupt beam availability
- Hall A Moller quads need work, target filling, some viewer broken
- Hall D can ask for beam (beam on now), but may be taken away for extraction work
- Hall-D/GlueX items
- beam issues
- drifting y-position
- left should in y in tagger harp scan
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- magnet ramping now...done by 2 pm
- Lubomir proposal, executed overnight last night
- quadrupole commissioning study
- FCAL field dependence study data being taken now (Adesh)
- pair spectrometer study while ramping?
- other systems?
- beam issues
- Run Plan
- Offline analysis?
- Next meeting?
- AOB?
Sunday, March 27
No meeting.