Difference between revisions of "Run Planning Meeting Notes, March 27-April 2, 2016"
From GlueXWiki
(wed.) |
(→Wednesday, March 30) |
||
Line 1: | Line 1: | ||
+ | ==Thurssday, March 31== | ||
+ | |||
+ | # Accelerator Status | ||
+ | ## Problem with RF separation work yesterday succeeded, ran A and D overnight | ||
+ | ## beam studies scheduled for today (4 hours) | ||
+ | # Hall-D/GlueX items | ||
+ | ## fluctuating DAQ livetime solved (David) | ||
+ | ## Fast Feed-Back turned on and working... | ||
+ | ## beam intensity fluctuations, +-5% about nominal 200 nA, 6 second period | ||
+ | ## diamond tuning by Hovanes | ||
+ | ##* JD70-118 now much more centered | ||
+ | ##* reduction in beam halo counter in tagger hall by 30% | ||
+ | ##* continue with JD70-118 (at least for now) | ||
+ | ## straight track analysis? | ||
+ | ## Elton on rates? | ||
+ | ## other systems? | ||
+ | # Run Plan | ||
+ | #* 12:00 intensity/lock study | ||
+ | #* 13:00 trigger studies | ||
+ | #* 17:00 production running | ||
+ | # Offline analysis? | ||
+ | # Administrative Items | ||
+ | #* Run Coordinator change tomorrow | ||
+ | # AOB? | ||
+ | |||
==Wednesday, March 30== | ==Wednesday, March 30== | ||
Revision as of 08:42, 31 March 2016
Contents
Thurssday, March 31
- Accelerator Status
- Problem with RF separation work yesterday succeeded, ran A and D overnight
- beam studies scheduled for today (4 hours)
- Hall-D/GlueX items
- fluctuating DAQ livetime solved (David)
- Fast Feed-Back turned on and working...
- beam intensity fluctuations, +-5% about nominal 200 nA, 6 second period
- diamond tuning by Hovanes
- JD70-118 now much more centered
- reduction in beam halo counter in tagger hall by 30%
- continue with JD70-118 (at least for now)
- straight track analysis?
- Elton on rates?
- other systems?
- Run Plan
- 12:00 intensity/lock study
- 13:00 trigger studies
- 17:00 production running
- Offline analysis?
- Administrative Items
- Run Coordinator change tomorrow
- AOB?
Wednesday, March 30
- Accelerator Status
- Problem with RF separation yesterday
- Beam taken away for RF work, 4 pm - 10 pm
- Go back to work on issue today
- beam studies scheduled for Thursday
- Problem with RF separation yesterday
- Hall-D/GlueX items
- FCAL gain/calibration mystery (Adesh)
- gluonraid space (David)
- new microscope bias voltages (Richard)
- fluctuating DAQ livetime
- production running with tagger quad. current variation, deferred (Richard)
- other systems?
- Run Plan
- 10:00 transmission studies
- ??:?? trigger studies
- Offline analysis?
- Administrative Items
- Run List, Paper Form
- AOB?
Tuesday, March 29
- Accelerator Status
- Problem with RF 2L07-7 overnight, control module replaced
- today after lunch: spin studies, will have few interruptions of 15 min. each
- beam studies scheduled for Thursday
- Hall-D/GlueX items
- beam issues
- drifting y-position
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- Solenoid magnet trip, Mon. 9 am
- FCAL field dependence study data being taken yesterday (Adesh)
- pair spectrometer study while ramping: deferred
- gluonraid space
- other systems?
- beam issues
- Run Plan
- Tuesday
- 10:00 study photon beam intensity as function of locks, polarization
- 12:00 trigger studies
- 16:00 transmission studies
- 17:00 production running
- Wednesday
- 00:00 production running with tagger quad. current variation
- Tuesday
- Offline analysis?
- Administrative Items
- Standard Conditions
- Google Calendar
- AOB?
Monday, March 28
- Accelerator Status
- started beam delivery Sunday
- today: Hall B 1-pass extraction work will interrupt beam availability
- Hall A Moller quads need work, target filling, some viewer broken
- Hall D can ask for beam (beam on now), but may be taken away for extraction work
- Hall-D/GlueX items
- beam issues
- drifting y-position
- left should in y in tagger harp scan
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- magnet ramping now...done by 2 pm
- Lubomir proposal, executed overnight last night
- quadrupole commissioning study
- FCAL field dependence study data being taken now (Adesh)
- pair spectrometer study while ramping?
- other systems?
- beam issues
- Run Plan
- Offline analysis?
- Next meeting?
- AOB?
Sunday, March 27
No meeting.