(Created page with "__TOC__ == Meeting Information == GlueX PID Upgrade Meeting<br> Friday, April 22, 2016<br> 11 am, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via...") |
|||
Line 19: | Line 19: | ||
# Announcements | # Announcements | ||
# Optical box design update (MIT) | # Optical box design update (MIT) | ||
− | # Bar box shipping (John and Matt) | + | # [[Bar box shipping (John and Matt)|https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5]] |
# Support structure design update (IU) | # Support structure design update (IU) | ||
# [[DIRC Planning for FY16|Planning for FY16]] | # [[DIRC Planning for FY16|Planning for FY16]] | ||
# AOB | # AOB |
Revision as of 14:23, 21 April 2016
Meeting Information
GlueX PID Upgrade Meeting
Friday, April 22, 2016
11 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box design update (MIT)
- https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5
- Support structure design update (IU)
- Planning for FY16
- AOB