Difference between revisions of "Run Planning Meeting Notes, Feb 23- Mar 1, 2017"
From GlueXWiki
Line 8: | Line 8: | ||
# Accelerator Status over the last 24 hrs | # Accelerator Status over the last 24 hrs | ||
#* Beam was mostly | #* Beam was mostly | ||
− | #** | + | #** Stable until midnight |
#** Downtime incidents of more than 30 minutes: | #** Downtime incidents of more than 30 minutes: | ||
− | #*** | + | #*** DAQ 10:45 for about 40 min. , Sergey helped |
− | #*** | + | #*** Beam position lock on active collimator steered the beam away: 00:15 |
− | #** | + | #*** Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?) |
− | #* Harp | + | #* Harp scans: |
#** Beam was re-focused around noon [https://logbooks.jlab.org/entry/3461340 ELOG] | #** Beam was re-focused around noon [https://logbooks.jlab.org/entry/3461340 ELOG] | ||
#** final MCC scans : [https://logbooks.jlab.org/entry/3461330 IHA5C11], [https://logbooks.jlab.org/entry/3461337 IHA5C11B] | #** final MCC scans : [https://logbooks.jlab.org/entry/3461330 IHA5C11], [https://logbooks.jlab.org/entry/3461337 IHA5C11B] | ||
#** Radiator HARP scans: [https://logbooks.jlab.org/entry/3461348 Radiator Harp] | #** Radiator HARP scans: [https://logbooks.jlab.org/entry/3461348 Radiator Harp] | ||
#*** (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43). | #*** (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43). | ||
+ | #** new Harp scans as part of beam steering problem: [https://logbooks.jlab.org/entry/3461613 MCC], [https://logbooks.jlab.org/entry/3461624 Radiator Harp] | ||
+ | |||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
#* In the last 24 hours: | #* In the last 24 hours: | ||
Line 23: | Line 25: | ||
#** Feb 22: Total triggers collected: TBD M | #** Feb 22: Total triggers collected: TBD M | ||
# Issues | # Issues | ||
− | #* | + | #* Active collimator |
#* DAQ issues: | #* DAQ issues: | ||
− | #** | + | #** difficult restart at 10:45 |
− | + | ||
# Monitoring | # Monitoring | ||
− | #* | + | #* |
# Run Plan | # Run Plan | ||
− | #* | + | #* Repair active collimator. |
#* Do we need an empty target run ? | #* Do we need an empty target run ? | ||
# Offline Analysis? | # Offline Analysis? | ||
#* | #* | ||
# Any Other Business? | # Any Other Business? |
Revision as of 09:36, 23 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 23
- Accelerator Status over the last 24 hrs
- Beam was mostly
- Stable until midnight
- Downtime incidents of more than 30 minutes:
- DAQ 10:45 for about 40 min. , Sergey helped
- Beam position lock on active collimator steered the beam away: 00:15
- Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?)
- Harp scans:
- Beam was re-focused around noon ELOG
- final MCC scans : IHA5C11, IHA5C11B
- Radiator HARP scans: Radiator Harp
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
- new Harp scans as part of beam steering problem: MCC, Radiator Harp
- Beam was mostly
- Hall-D/GlueX items
- In the last 24 hours:
- Feb 22: ABU TBD hrs (TBD), BANU TBD hrs (TBD)
- Feb 22: Total triggers collected: TBD M
- In the last 24 hours:
- Issues
- Active collimator
- DAQ issues:
- difficult restart at 10:45
- Monitoring
- Run Plan
- Repair active collimator.
- Do we need an empty target run ?
- Offline Analysis?
- Any Other Business?