==Friday, March 3 == | ==Friday, March 3 == | ||
+ | |||
# Accelerator Status over the last 24 hrs | # Accelerator Status over the last 24 hrs | ||
− | #* Vacuum issues [6 hours down] | + | #* Vacuum issues [~6 hours down] |
+ | #* 1630 - Beam back | ||
+ | #* 1730 - Attempt at trigger & DAQ studies | ||
+ | #* 2000 - Start of production | ||
#* Strip charts: | #* Strip charts: | ||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
− | #* | + | #* Harp scans: [https://logbooks.jlab.org/entry/3464169 Accel.], [https://logbooks.jlab.org/entry/3464184 Hall D], [https://logbooks.jlab.org/entry/3464277 Hovanes analysis] |
+ | #* DAQ studies | ||
+ | #* [https://logbooks.jlab.org/entry/3464181 MO phase drift] (Elton) | ||
#* In the last 24 hours: | #* In the last 24 hours: | ||
#** Total triggers collected during last period: M | #** Total triggers collected during last period: M | ||
Line 63: | Line 69: | ||
#** Current Total: B | #** Current Total: B | ||
# Issues | # Issues | ||
− | #* Red lines on run control GUI | + | #* Red lines on run control GUI? |
# Monitoring | # Monitoring | ||
#* [https://logbooks.jlab.org/entry/ low-level report] | #* [https://logbooks.jlab.org/entry/ low-level report] | ||
− | #* Offline launch readiness | + | #* Offline monitoring launch readiness |
# Run Plan | # Run Plan | ||
#* Production | #* Production | ||
− | #* | + | #* Tagger/SC trigger |
#* fADC250 Compressed Mode? | #* fADC250 Compressed Mode? | ||
#* Next week: | #* Next week: |
Revision as of 22:53, 2 March 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, March 2
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 6.49 | 0.63 | 0.88 |
Swing | 6.97 | 0.32 | 0.71 |
Owl | 7.09 | 0.11 | 0.80 |
Total | 20.55 | 1.06 | 2.39 |
- Accelerator Status over the last 24 hrs
- Smooth sailing
- Strip charts: 1 2 3
- AC position drift
- Hall-D/GlueX items
- In the last 24 hours:
- Production data taken after 10:30 AM Weds.
- Long mode run
- Black spots on diamonds
- Total triggers collected during last period: 3099M
- Run Statistics Spread Sheet
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- Problems with FCAL crate 9
- FCAL red light issue
- TRD gas issue
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- Monitoring
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB
Friday, March 3
- Accelerator Status over the last 24 hrs
- Vacuum issues [~6 hours down]
- 1630 - Beam back
- 1730 - Attempt at trigger & DAQ studies
- 2000 - Start of production
- Strip charts:
- Hall-D/GlueX items
- Harp scans: Accel., Hall D, Hovanes analysis
- DAQ studies
- MO phase drift (Elton)
- In the last 24 hours:
- Total triggers collected during last period: M
- Run Statistics Spread Sheet
- Current Total: B
- Issues
- Red lines on run control GUI?
- Monitoring
- low-level report
- Offline monitoring launch readiness
- Run Plan
- Production
- Tagger/SC trigger
- fADC250 Compressed Mode?
- Next week:
- High rate run [500 nA]
- Low rate run [50 nA + 2x10^-5 RL Al]
- Offline Analysis
- TAC runs?
- AOB