Difference between revisions of "Run Planning Meeting Notes, Mar 2 - Mar 8, 2017"
From GlueXWiki
(→Friday, March 3) |
(→Friday, March 3) |
||
Line 51: | Line 51: | ||
==Friday, March 3 == | ==Friday, March 3 == | ||
− | + | {|border | |
+ | |- | ||
+ | ! Shift !! ABU !! BNA !! BANU | ||
+ | |- | ||
+ | |Day || 0.79 || 0.00 || 7.21 | ||
+ | |- | ||
+ | |Swing || 4.75 || 0.75 || 2.50 | ||
+ | |- | ||
+ | |Owl || 6.83 || 0.08 || 1.09 | ||
+ | |- | ||
+ | |Total || 12.37 || 0.83 || 10.80 | ||
+ | |- | ||
+ | |} | ||
Line 68: | Line 80: | ||
#* [https://logbooks.jlab.org/entry/3464181 MO phase drift] (Elton) | #* [https://logbooks.jlab.org/entry/3464181 MO phase drift] (Elton) | ||
#* In the last 24 hours: | #* In the last 24 hours: | ||
− | #** Total triggers collected during last period: [r30920+] | + | #** Total triggers collected during last period: [r30920+] ~1250M |
#** Run Statistics [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1113040681 Spread Sheet] | #** Run Statistics [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1113040681 Spread Sheet] | ||
#** Current Total: B | #** Current Total: B |
Revision as of 09:40, 3 March 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, March 2
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 6.49 | 0.63 | 0.88 |
Swing | 6.97 | 0.32 | 0.71 |
Owl | 7.09 | 0.11 | 0.80 |
Total | 20.55 | 1.06 | 2.39 |
- Accelerator Status over the last 24 hrs
- Smooth sailing
- Strip charts: 1 2 3
- AC position drift
- Hall-D/GlueX items
- In the last 24 hours:
- Production data taken after 10:30 AM Weds.
- Long mode run
- Black spots on diamonds
- Total triggers collected during last period: 3099M
- Run Statistics Spread Sheet
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- Problems with FCAL crate 9
- FCAL red light issue
- TRD gas issue
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- Monitoring
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB
Friday, March 3
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 0.79 | 0.00 | 7.21 |
Swing | 4.75 | 0.75 | 2.50 |
Owl | 6.83 | 0.08 | 1.09 |
Total | 12.37 | 0.83 | 10.80 |
- Accelerator Status over the last 24 hrs
- Vacuum issues [~8 hours down]
- 1630 - Beam back
- 1730 - Attempt at trigger & DAQ studies
- 1800 to 1840 - ACC access to replace controller
- 1900 to 1930 - FSD Card swap
- 2000 - Start of production
- 500 - 20 min down due to cryomodule problems
- Strip charts: 1
- Hall-D/GlueX items
- Harp scans: Accel., Hall D, Hovanes analysis
- DAQ studies
- MO phase drift (Elton)
- In the last 24 hours:
- Total triggers collected during last period: [r30920+] ~1250M
- Run Statistics Spread Sheet
- Current Total: B
- Issues
- Red lines on run control GUI?
- Front-panel triggers off for 30920-2
- Firefox problems
- Monitoring
- low-level report
- Offline monitoring launch readiness
- Run Plan
- Tagger/SC trigger
- Hall A Bleed-through?
- Empty target run?
- fADC250 Compressed Mode?
- Production
- Next week:
- High rate run [500 nA]
- Low rate run [50 nA + 2x10^-5 RL Al]
- Offline Analysis
- TAC runs?
- AOB