Difference between revisions of "Run Planning Meeting Notes, Mar 9 - Mar 15, 2017"
From GlueXWiki
(→Thursday, March 9) |
(→Thursday, March 9) |
||
Line 15: | Line 15: | ||
|Day ||align="center"| 0:40 ||align="center"| 7:18 ||align="center"| 0:02 | |Day ||align="center"| 0:40 ||align="center"| 7:18 ||align="center"| 0:02 | ||
|- | |- | ||
− | |Swing || 0:0 || 8:0 || 0.0 | + | |Swing ||align="center"| 0:0 ||align="center"| 8:0 ||align="center"| 0.0 |
|- | |- | ||
− | |Owl || 0:24 || 6:55 || 0:41 | + | |Owl ||align="center"| 0:24 ||align="center"| 6:55 ||align="center"| 0:41 |
|- | |- | ||
− | |Total || 1:04 || 22:13 || 0:43 | + | |Total |||align="center"1:04 |||align="center" 22:13 |||align="center" 0:43 |
|- | |- | ||
|} | |} |
Revision as of 08:00, 10 March 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, March 9
Shift | ABU | BNA | BANU |
Day | 0:40 | 7:18 | 0:02 |
Swing | 0:0 | 8:0 | 0.0 |
Owl | 0:24 | 6:55 | 0:41 |
Total | align="center"1:04 | align="center" 22:13 | align="center" 0:43 |
- Accelerator Status over the last 24 hrs
- Accelerator busy with Hall C until 05:00
- Hall D first given beam at 05:20
- Data collection at 50nA started at 08:00
- Hall-D/GlueX items
- In the last 24 hours:
- Low-intensity production started at 08:00
- Long mode run (10 minutes) done at
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- DAQ issues:
- Monitoring
- low-level report
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB
Friday, March 10
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 0:40 | 7:18 | 0:02 |
Swing | 0:0 | 8:0 | 0.0 |
Owl | 0:24 | 6:55 | 0:41 |
Total | 1:04 | 22:13 | 0:43 |
- Accelerator Status over the last 24 hrs
- Accelerator busy with Hall C until 05:00
- Hall D first given beam at 05:20
- Data collection at 50nA started at 08:00
- Hall-D/GlueX items
- In the last 24 hours:
- Low-intensity production started at 08:00
- Long mode run (10 minutes) done at
- Current Total: 40.05B
- In the last 24 hours:
- Issues
- DAQ issues:
- 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
- ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
- DAQ issues:
- Monitoring
- low-level report
- Run Plan
- Production
- Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
- Offline Analysis
- TAC runs?
- AOB