Difference between revisions of "June 14, 2017, Production & Analysis Working Group"
From GlueXWiki
(→Data Production) |
(→Data Production) |
||
Line 38: | Line 38: | ||
# Processing Update --- Alex Austregesilo | # Processing Update --- Alex Austregesilo | ||
#* Status of the last Spring 2016 production launch: done for runs <math>\ge</math> 11366 | #* Status of the last Spring 2016 production launch: done for runs <math>\ge</math> 11366 | ||
− | #* [https://halldweb.jlab.org/data_monitoring/recon/summary_swif_output_recon_2017-01_ver01_batch01.html | + | #* Status of the first Spring 2017 production launch: [https://halldweb.jlab.org/data_monitoring/recon/summary_swif_output_recon_2017-01_ver01_batch01.html batch01 started on 06/12/17, almost at 10%] |
=== Analysis Focus: Total Cross Sections === | === Analysis Focus: Total Cross Sections === |
Revision as of 12:04, 14 June 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday June 14, 2017 at 2:00 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
- To join via phone, use one of the following numbers and the Conference ID: 115815824.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Reconstruction & Analysis Studies Status
Agenda
- Announcements
- Data Production
- Analysis Focus
- This Week's Studies
- Any other studies
- Upcoming Study Schedule
This Week's Topics
- Talks: Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
- Talks should be limited to 10 + 5 minutes.
Data Production
- Calibration Update --- Sean Dobbs
- Monitoring Update --- Thomas Britton
- Processing Update --- Alex Austregesilo
- Status of the last Spring 2016 production launch: done for runs 11366
- Status of the first Spring 2017 production launch: batch01 started on 06/12/17, almost at 10%
Analysis Focus: Total Cross Sections
- J/Ψ, φ update --- Lubomir
- η, ρ, ω, φ --- Simon
- φ --- Thomas
- ω --- Christiano
- Any others?
Studies: Alignment & Track/Shower Efficiencies
(i.e. Is the reconstruction working?) Updates on experiment, simulation, and the comparison between the two.
- Drift chamber alignment --- Mike Staib
- Tracking Efficiencies --- Paul Mattione
- BCAL Shower Efficiencies --- Elton Smith
- FCAL Shower Efficiencies --- Jon Zarling
Upcoming Study Schedule
- Updates on experiment, simulation, and the comparison between the two.
- Summary/overviews only. Detailed discussions should be held in the appropriate working groups.
- All talks should be limited to 10 + 5 minutes.
Next Week: Other Updates on experiment, simulation, and the comparison between the two.
- Track / Hit Matching: BCAL, FCAL, TOF, SC --- Paul Mattione, Simon
- Efficiencies: TOF, SC --- Beni, Mahmoud
- Means & Resolutions (time, energy, dE/dx): Tracking, BCAL, FCAL, SC, TOF
- Uncertainties: PID (BCAL, FCAL, TOF, dE/dx), Kinfit (BCAL, FCAL, tracking)
- Channel/Analysis Studies: Branching ratios, cross sections, SDMEs, beam asymmetries
- Other reconstruction/analysis issues
Week after next: Beamline & Triggering
- Flux --- Justin
- Beam energy --- Beamline Group
- Polarization (TPOL & lineshape) --- Beamline Group
- Beam Asymmetries --- Alex Austregesilo
- Trigger emulation --- Alex Somov
- Triggering efficiency --- Alex Somov
The following week: Hit Efficiencies (i.e. Is the detector working?) Updates on experiment, simulation, and the comparison between the two.