Difference between revisions of "August 29, 2017 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 20: | Line 20: | ||
# Optical box | # Optical box | ||
#* Design and PMT mounting update (Jason) | #* Design and PMT mounting update (Jason) | ||
− | #* Simulation studies (Maria and Roman) ([https://halldweb.jlab.org/wiki/images/a/a1/DIRC_Online_Calibration_Preliminary_Studies-2.pdf Mirror | + | #* Simulation studies (Maria and Roman) ([https://halldweb.jlab.org/wiki/images/a/a1/DIRC_Online_Calibration_Preliminary_Studies-2.pdf Mirror calibration (Cristiano)]) |
#* Electronics (Fernando) | #* Electronics (Fernando) | ||
# Bar box transportation and monitoring | # Bar box transportation and monitoring |
Revision as of 13:05, 29 August 2017
Meeting Information
GlueX DIRC Meeting
Tuesday August 29, 2017
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John)
- Optical box
- Design and PMT mounting update (Jason)
- Simulation studies (Maria and Roman) (Mirror calibration (Cristiano))
- Electronics (Fernando)
- Bar box transportation and monitoring
- Monitoring logistics (John and Yunjie)
- Camera monitoring system (Greg)
- Dry run at IU (All)
- Written plans for testing, power needs, required equipment, etc.
- Water system update (Tim)
- Nitrogen system in Hall (Tom)
- AOB